Skip to content

How to Install Your PET Acoustic Panels

One person. Basic tools. No specialist fixings.

Illustrative animation — the fixing sequence is shown as a visual guide only. Always follow the installation instructions supplied with your panels.

The Four Steps

Step 1: Plan & dry-lay1Illustrative render

Plan & dry-lay

Measure the wall and lay panels out before fixing anything.

Step 2: Clean the wall2Illustrative render

Clean the wall

Wipe down so the adhesive or tape bonds to a dust-free surface.

Step 3: Cut to size3Illustrative render

Cut to size

Score with a sharp blade against a straight edge.

Step 4: Mount & press4Illustrative render

Mount & press

Fit the panel and press firmly across the face.

Tools You Need

📏Tape Measure
📐Steel Ruler
🔪Utility Knife
🧭Level
✏️Pencil
🧴Adhesive / Tape

Step by Step

1

Plan Your Layout

  • Measure the wall width and height and sketch your panel layout
  • Dry-lay the panels on the floor first to check colour and batch matching
  • Plan your pattern — fluted, flat, chevron or mixed — and decide on the seam direction
  • Decide the mount: tape (temporary / smooth walls), adhesive (permanent), magnets (metal walls)
2

Prep the Surface

  • Clean the wall with a degreasing cleaner or rubbing alcohol and let it dry fully
  • Remove outlet covers, switch plates and wall fixtures
  • The surface should be smooth, dry and dust-free — PET panels are light, but the bond is only as good as the substrate
3

Cut to Size

  • Use a steel ruler as a straight edge and a sharp utility knife
  • Tilt the blade in by 0.5–1 mm so the cut closes to a tight, invisible bevel
  • Cut from the face side for fluted profiles, from the back for flat panels
  • Test-fit each panel before you commit to the mount
4

Mount the Panels

  • Tape: apply double-sided tape to the panel back in a grid, peel and press into position
  • Adhesive: run a bead of structural adhesive, press the panel on and support it while it cures
  • Magnets: fix the magnet plates to the wall, snap the panel on — ideal for metal surfaces and removable walls
  • Start from the bottom or from a centre reference line and work outwards, keeping reveals even
5

Finish & Enjoy

  • Reinstall outlet covers and wall fixtures, and fit trims to exposed edges
  • Clean any dust from the felt surface with a soft brush or vacuum
  • Need more absorption? Fit 25 mm battens behind the panels to create an air gap and lift the NRC class
  • Share your install: #CYCWallChallenge

Pro Tips

💡

Acclimatise panels in the room for 24 hours before installing

💡

Dry-lay first: felt colour can vary slightly between production batches

💡

Mounting changes performance — an air gap behind the panel raises the NRC class

💡

Best results between 65°F and 85°F; adhesive needs a warm, dry wall

💡

Do not install on freshly painted walls (wait 30 days), damp surfaces or loose wallpaper

💡

Keep one spare panel for future repairs

Installation FAQ

Download PDF Guide

Print-friendly installation guide.

Need Help?

JARVIS can walk you through any step.

Chat with JARVIS →